Parts of the London Underground could be shut to quicken the revamp of the network under the £14bn PPP.
References: The Times 04/08/03 page 20 (Need to know), The Daily Telegraph 04/08/03 page 27 (The City Checklist)
Parts of the London Underground could be shut to quicken the revamp of the network under the £14bn PPP.
References: The Times 04/08/03 page 20 (Need to know), The Daily Telegraph 04/08/03 page 27 (The City Checklist)
Developer LondonMetric being advised on the letting by Knight Frank
Redevelopment of three buildings in Holborn will total more than half a million square feet
COMMENT Jonathan Vandermolen on mounting pressures for the market
The duo will look to let the restored building’s top fifth floor