The Holyrood parliament’s cost consultant, Davis Langdon and Everest, has told the inquiry into the project the cost could soar to £420m.
The figures is £20m higher than previous estimates.
The new calculation triggered fresh anger at the building’s consistent cost overruns.
References: Financial Times 19/02/04 page 3